How much does a website cost?
A few quick questions and you'll have a number to plan around. Every choice shows what it adds before you pick it, so you can see which parts of your own brief are the expensive ones. Then book a free consultation and the ballpark becomes a line-itemed estimate.
Prices last updated November 2026
Your ballpark
$18,750 to $25,000, about 10 to 14 weeks.
For a new marketing website: 6 to 12 page designs, 12 pages in total, typical pages, content written. About 10 to 14 weeks.
- Design and build, up to 5 page designs$10,000 to $12,000
- 6 to 12 page designs$3,500 to $5,000
- Fuller pages$1,250 to $2,500
- Content for all 12 pages, written$2,500 to $3,000
- SEO baseline at launch$1,500 to $2,500
Total$18,750 to $25,000
Ballpark, not a quote. The estimate I write for you after we talk is the only number a project is held to.
How the number is built
The same way I build a quote
Every website starts from a base: the design, the build, a CMS you can edit and a launch. Then the website design cost grows with the things that genuinely change the work, added one line at a time. What you pay after launch is separate and much smaller: website maintenance starts at $39 a month.
Designs first, then pages
A page design is a layout, drawn and built once. Pages are what get made from it, so twenty service pages on one design cost far less than twenty designs. The total page count matters for the words and the setup.
How much is on them
A page of text and a photo is quick. A long page with interactive pieces, data or illustration takes real time, so it's priced as a share of the design and build.
The words, page by page
Writing or moving content is priced per page across the whole site. If you're supplying the words, the first ten pages are part of the build and each one after that has a small setup cost.
Each extra on its own
A store, a members area and a booking form are different amounts of work, so each one carries its own price. Anything your kind of site already needs is included.
A redesign starts ahead
Building on a structure and content that already exist takes some of the work out, and a redirect map makes sure the rankings you've earned come with you.
Rush, when you need it
25% more takes 25% off the timeline, on any size of build. It works as long as approvals on your side keep the same pace.
Questions
Things people ask about the number
Does it change if it's grant money?
How accurate is this?
What does rush mean here?
What isn't in the number?
Why a range and not a price?
Adrial is my go-to designer for anything my business needs … which is why I have used him for three different companies over the last 20+ years.
Craig WoodCEO, DefinianPrice yours line by line
Let's have a quick meeting. Bring the ballpark, tell me what you have and what you need, and I'll come back with a real estimate and real dates.




